Sharp CP-SR421 Instrukcja Użytkownika Strona 53

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 52
3. SIGNALS AND WIRING
3 - 12
3.3.2 Power-on sequence
(1) Power-on procedure
1) Always wire the power supply as shown in above section 3.1 using the magnetic contactor with
the main circuit power supply (3-phase: L1, L2, and L3, 1-phase: L1 and L3). Configure up an
external sequence to switch off the magnetic contactor as soon as an alarm occurs.
2) Switch on the control circuit power supply (L11 and L21) simultaneously with the main circuit
power supply or before switching on the main circuit power supply. If the control circuit power
supply is turned on with the main circuit power supply off, and then the servo-on command is
transmitted, [AL. E9 Main circuit off warning] will occur. Turning on the main circuit power supply
stops the warning and starts the normal operation.
3) The servo amplifier receives the servo-on command within 3 s to 4 s after the main circuit power
supply is switched on.
(Refer to paragraph (2) of this section.)
(2) Timing chart
(Note)
(3 s)
95 ms 10 ms 95 ms
Servo-on command accepted
Main circuit
Control circuit
Base circuit
Servo-on command
(from controller)
power supply
ON
OFF
ON
OFF
ON
OFF
Note. The time will be longer during the magnetic pole detection of a linear servo motor and direct drive motor.
3 s to 4
Przeglądanie stron 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 ... 403 404

Komentarze do niniejszej Instrukcji

Brak uwag