FTS 370d/w/r Revision 10 – 1/09/2015 25
Flashhead Installation
Mounting
Flash Technology recommends the
installation of one or more lightning rods
near the uppermost flashhead(s). The
copper lightning rods should extend a
minimum of 36” above the height of the
flashhead and a minimum of 18”
horizontally away from the flashhead.
The flashhead is mounted to the tower
pedestal utilizing ½ inch galvanized or
stainless steel hardware. Four mounting
holes are provided on the flashhead base
(Figure 2-12). The mounting holes will
align with most tower pedestals. The
flashhead must be installed level to
maintain light output in accordance with
FAA requirements.
Leveling
1. Verify that the mounting surface is
free of debris.
2. Align the four mounting holes in the
base of the flashhead with the holes in
the tower or pedestal’s mounting plate.
3. Leaving the hardware assemblies
loose, secure the flashhead with ½ inch
stainless steel or galvanized hardware
(Part # 5991777).
4. With the light engine secured by the
two latches on the base, place a level
on top of the flashhead and verify that
it is level in two directions.
Note: Flash Technology’s “T”- Level
(Optional Part # 11000013455) has two
vials to simplify installation.
5. If the flashhead is not level, add
stainless steel shim material or washers
(stainless steel or galvanized) as
necessary to level the flashhead.
6. Tighten the hardware once the
flashhead is level in both directions.
Verify that the flashhead is level when
the hardware is fully tightened. If
necessary, loosen the mounting
hardware and repeat Step 5 until the
flashhead is level with the hardware
fully tightened.
Figure 2-6 – Flashhead Leveling