Sharp JX-9400 Informacje Techniczne Strona 93

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 211
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 92
measuring the air speed at several locations and integrating over the whole
opening or using a tracer gas.
g
Q
g
þ
t
C
t
pðz
t
Þ
n
þ
ð
z
n
z
rb
dð
r
C
r
pðz
r
Þ
n
Þ¼0 ð4:26Þ
3 Windows open at the top level the airfl ow through these windows, Q
t
,is
measured. We have similarly:
g
C
g
pðz
g
Þ
n
þ
t
Q
t
þ
ð
z
rt
z
rb
dð
r
C
r
pðz
r
Þ
n
Þ¼0 ð4:27Þ
The neutral plane is now at the top level.
Assuming that n is 0.6 or two-thirds, which are the most probable values, the
system of three equations above can be solved to estimate C
g
, a global C
r
and
C
t
. If the temperatures are not uniform inside or outside, Equation 4.21
should be used instead of Equation 4.22. The system is then more complex
but can still be solved. The most important condition to observe during the
measurement is the absence of wind.
The ma in advantage of the method is that it does not require the use of
sophisticated equipment. As a minimum, the required equipment is:
.
wind velocity meter, 0–5 m/s, for measuring the airflow rate in the openings;
.
differential manometers, 0–50 Pa;
.
air temperature thermometers;
.
length measuring device as long as the building is tall.
This equipment can be completed by more differential manometers and more
thermometers, used to verify the linearity of the pressure distribu tion through
the building.
Neutral height method
A simple vari ant of the stack effect method offers in many cases a good estimate
of the leakage area and determines if specifications are met or exceeded (Van der
Maas et al., 1994). It is also based on the determination of the neutral height
and the equipment necessary is only an airflow direction detector (small
smoke generator such as a cigarette, incense stick or small flame) and a yard-
stick. With no wind, this method even allows the leakage characterization of
a single storey building.
The measurement should be performed with the mechanical ventilation
system switched off, preferably on a cold day without wind and when the
building is heated. In these conditions, the airflow through the building results
from buoyancy only. The method can also be used, mutatis mutandis, in cooled
buildings in a warm climate.
The principle is to determine the position of the neutral height in an out side
opening such as a door. The airflow direction detector is moved from bottom to
72 Ventilation and Airflow in Buildings
Przeglądanie stron 92
1 2 ... 88 89 90 91 92 93 94 95 96 97 98 ... 210 211

Komentarze do niniejszej Instrukcji

Brak uwag